1. INSTALLATION

2. PRIMARY CIRCUIT CONNECTION


Install the control unit in the specific case, first releasing it from the top bracktes and then from the bottom ones
 
Connection of entry/return flow
primary circuits from the heat generator

  3. SECONDARY CIRCUIT CONNECTION

4. FILLING THE SYSTEM (STEP 1)

Connection and tightening of entry/return flow secondary circuit from high temperature and low temperature

Close the entry/return valves of the primary circuit (red and blue), open manually the first thermostatic shutter and turn the specific knob anticlockwise

5. FILLING THE SYSTEM (STEP 2)

6. FILLING THE SYSTEM (STEP 3)

 


Close the following shutters by turning the
specific knobs clockwise

 

Open the fist lockshield by turning
the Allen wrench anticlockwise

 7. FILLING THE SYSTEM (STEP 4)

8. HYDRAULIC CONNECTION


Close the following lockshields by turning the Allen wrench clockwise. Filling syeps must be repeated for as many Tritone configuration chosen connections.

 
Hydraulic connection
 

 9.  ELECTRICAL CONNECTION

10. TEMPERATURE ADJUSTMENT

 
 Electrical connection

 
 
Liquid temperature adjustment of secondary
circuits with 11 mm spanner