Skip to content

Arquata del Tronto Forestry Carabinieri Barracks

The Carabinieri Forestali Barracks in Arquata del Tronto underwent a complete reconstruction following the severe structural damage caused by the 2016 earthquake. The project went beyond simple rebuilding, involving a detailed architectural study aimed at harmoniously integrating the new structure into the surrounding landscape, with a strong focus on energy efficiency and reducing environmental impact.

For the heating system, an underfloor heating solution by General Fittings was selected: VARMO FORM radiant panels with a thickness of 42 mm, combined with 17 mm PERT piping laid at a 10 cm spacing, ensure uniform heat distribution and optimal thermal comfort in every space.

Completing the system, ODINO 6500.H6 brass manifolds precisely manage water distribution and temperature mixing, delivering efficiency, safety, and long-term durability.

More references

Subscribe to our newsletter

Subscribe to our newsletter to stay up to date with all our news and events.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.